5 Series 500W11

save-money Created with Sketch.

Get Started Today!

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
save-money Created with Sketch.

How Much Can You Save?

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

5 Series 500W11

17.5 EER / 3.1 COP

Ultra Efficient Hot Water Generation - 1.5 to 6 tons

The wide range of operating temperatures, compact size, reversible control box and piping enable the 5 Series 500W11 hydronic heat pump to be used in a variety of applications. These include pool/spa heating, radiant floor, snow melt, aquaculture, and process water installations. 500W11 units can be used for heating only or heating/cooling. The 500W11 features Aurora base communicating controls with optional advanced controls, performance monitoring, and performance & refrigeration monitoring. All fault conditions are monitored by the controller to ensure safe, reliable operation. The cabinet is fabricated from heavy-gauge steel and finished with a corrosion-resistant polyester coating to provide years of durability and beauty. Scroll compressors, R-410A refrigerant, and oversized heat exchangers combine to provide the user with exceptional energy savings.

Schedule a Consultation

See if a geothermal system is right for your home

About First Geothermal Energy

Experience matters!! Perhaps the most important aspect of deciding upon a geothermal system installation is selecting a Geothermal installer. First Geothermal Energy is owned and operated by Mike Roberts. Mike has over twenty five years experience in the HVAC industry. Approximately fifteen Years ago he decided the future was geothermal, he has dedicated his geothermal career to the design and installation of a proper geothermal heat pump system for his customers. This starts with a complete evaluation of the current or future home or building. This includes measurements of the home;level of insulation; window and door sizes and grade; home exposure direction ect. All of this is done to determine the structures heat loss and heat gain. Once this is accurately calculated, a properly sized system, including the tonnage required and the size and design of the loop system is created.

Mike is a factory trained technician in geothermal design and installation, using the latest software and analytical data.

Licenced with the State of Ohio in HVAC and Plumbing Licence # 14124

Certified in refrigerant usage.

Certified in fusion welding techniques for the loop piping

Contact First Geothermal Energy

OFFICE ADDRESS
6113 Weilersville Rd
Smithville, Ohio 44677
PHONE NUMBER